First, pavement before the best one week or two weeks ahead of the bamboo flooring out of the box placed on the scene,interior garage wall wainscotting cladding so that bamboo flooring in the installation and construction sites before the humidity consistent, can effectively control the pavement after the expansion coefficient.
Second, the floor should be out of the window into the light angle parallel installation, the corridor or a smaller area of bamboo flooring room should be parallel with the longer walls,cost of fencing per foot installed so you can reduce the number of splicing saw a short, saving materials.
Third, the bamboo flooring is a natural material, its color and texture are different, can not be completely consistent, in addition to the floor of the production enterprises careful separation packaging, please in the construction of the floor color, texture, length, etc. for the appropriate deployment, So that the floor more natural.
Fourth, the installation of the ground must be smooth and dry.
5, the use of bamboo flooring is very long,what plastic material to use for ceiling of outdoor deck it is recommended to play keel installation, so that the installation of the floor is not easy to loose long-term use.
6, bedding keel must be dry. Keel specifications for the 30mm × 30mm or so, the length of the room size can be arbitrarily set. After positioning the keel,wpc composite deck veneer and then cement nails will be nailed to the ground in the keel. Keel fixed after the top layer of moisture-proof plastic film.
7, in the wet or particularly humid areas, such as China East and South China, the floor should not be assembled too tightly between, please set aside 0.5mm spacing. In dry and cold areas, such as northeast and northwest China, the natural joints between the floor is better.
8, between the floor and the wall must have more than 8mm reserved seam.
Nine, drilled in the floor of the public on the drill hole, and then the special floor nail to 45 degrees angle into the keel, not the use of gas nails.
10, floor installation is completed, it should immediately coated floor wax again, pay attention to the floor wax can only be painted in the gap, can not be painted on the floor surface.