Gas sealing machine is mainly operated with hand push + hand pouring tube, suitable for the sealing machine with smaller melt tank. When first added in the bin or asphalt pouring glue to one-third of the lit burner hob (grilled by igniting gun can not be used directly to ignite the flame combustion chamber if there is a certain risk on LPG) adjusted to the optimum ignition flame after flame,Road Router Crack then began to heat thermal oil inside the melt temperature by watching the thermometer shows at a glance. Soluble material time approximately 90 minutes.
According to the melting temperature of the pouring material, adjust the flame size. After dissolving the material for about 30 minutes to start the generator, turn on the power switch of the feeding tube is given feeding tube heating (about 40 minutes). In the material melts,Environmentally friendly asphalt paving equipment for sale market the material tube temperature reached after working. No hand pouring tube driven irrigation sewing machine resorted to spout positive feed crack pouring; handheld pouring tube with the pouring tube alignment crack pouring process. In the course of adding materials to ensure the continuity of the work at any time. Asphalt pump discharge flow rate is adjustable.
2、working principle of diesel heating sealing machine:Diesel irrigation sewing machine mainly hand-push and self-propelled hand pouring tube operation, the use of imported diesel oil burner heating. First, the bin was added at work or asphalt pouring glue,new design asphalt sealer start the generator power, followed by intermittent open conducting oil pump switch, burner switch, discharge tube heating switches; automatic temperature control system to adjust the temperature of the same material and by diesel automatic burner hot melt tank HTF began to heat up (trailer for the forced circulation) melting the material, the temperature is controlled by the automatic control system.
Soluble material time is about 30-40 minutes. In the material melts,driveway crack repair the material tube temperature can reach after work. Hand pouring tube alignment crack pouring process. Asphalt pump discharge flow rate is adjustable. In the course of adding materials to ensure the continuity of the work at any time. Before pouring want to clear the dust cracks within the joint treatment.