Summer install wood flooring must pay attention to the following questions! | Forum

Topic location: Forum home » General » General Chat
Deleted user Jul 20 '16, 06:58PM

Summer install wood flooring is not really a good choice,high quality outdoor panel since the summer air temperature and humidity, wood products easy to damp inflation, the destruction of their own physical characteristics. Should the period due to reasons, must be renovated in the summer, the owners have to pay attention to the summer to prepare for the laying of four kinds of solid wood flooring. First, to prevent uneven ground cause some uneven ground floor and keel vacant, it will beep when the stampede.

Second, to prevent drying without keel without drying wood keel moisture content is usually around 25%, and eligible wooden floor moisture content is generally 12% humidity difference over the General Assembly to make wooden floor quickly absorb moisture, causing the floor bagging, paint surface burst. First floor laid during the construction,corrosion-resistant-waterproof the construction and then the other on the floor. But this, after the flooring laid, often need to go through a month or even longer to polish painted. During vapor floor with the surrounding environment, the chemicals did not make any quarantine measures, it is likely to lead to wood moisture content due to rapid change and deformation. Third, preventing hit wedge plus nails used in the construction of fixed mode plus nails fixed wedge play mode will cause the wedge with nails because the contact surface is too small nail leaving less grip force, can easily result in wood keel loosening occurs when the sound of trampling floor. Fourth, to prevent the assembly too loose or too tight at the laying of the floor, the level should be reasonable arrangements for the tightness of the assembly based on the use of wood flooring workplace environment of temperature and humidity.

If too loose, there will be a greater contraction of the floor cracks, too tight, it will inflate the floor when bagging. Solid wood flooring, there is a common method of laying laying suspension method, affordable outdoor flooringthe keel laying method, subfloor keel laying, direct laying paste method. The more traditional method of laying the keel laying to the number of universal law, paving quality wood keel seriously affect the life of the floor. So, how acceptance flooring wood flooring keel keel acceptance what issues need attention Method for Installation Acceptance floor wooden keel after:

1, first measure the distance between the wooden keel pavement whether the wood floor installation requirements coincide; 2, note check the plane wooden keel is flat and smooth; 3, Take a look at the installation, nails quality wooden fixed keel (mainly refers to the length and hardness); 4, check whether the loosening nails fixed good, if necessary re-nailed; 5, the focus check installation fastness wooden keel, to prevent loose, scattered desert phenomenon;Waterproof Outdoor Wood Floor 6, attention to whether the wooden keel shape consistent with the design requirements; 7, focused look at the keel and wooden wall is connected at a reasonable gap; 8, pay attention to wood keel with large ground clearance if existed; 9, if the presence of ground clearance you need to pay attention to wood keel with plug pad method of ground clearance; 10 correct gap stopper pad should use wedges instead of wood