board, use special tools will be completely smashed into the nail, and color similar to the nail ointment, extra clean, to ensure that beautiful. Three, so that the floor is more durable pavement maintenance can not be less than the lack of maintenance of the floor after the pavement is part of the maintenance, the same can not be the lack of inspection maintenance. After the completion of the entire floor paving

project, the need for timely inspection of the floor surface. Other construction needs to be done to protect, so as to protect the floor. The first step: check in time after paving floor decking, can not be admitted immediately, the general recommendations in a timely manner in the pavement after 24 hours to 7 days, if not timely check, please keep the indoor air circulation, regular maintenance, every week.

The second step: after the furniture into the floor pavement pavement after 48 hours (usually this time become the floor of the maintenance period), to avoid the floor often walk and placed heavy, this can give sufficient time to floor glue pasted firmly aside, let the floor dry before moving into Home Furnishing. The third step: after paving the environment requirements for the indoor environment, mainlyThe windows

decking planks price
decking per metre square installed
wood roof deck


The Wall

No comments
You need to sign in to comment

Post

Added Jun 13 '17, 08:17PM

Rate

Your rate:
Total: (0 rates)