waterproof measures is good, the house is a Water Leakage situation, if there should be processed after shop floor. Two, pay more attention to the process of paving the process of monitoring the protection of the floor paving process is more complex, the steps are also numerous, want to do a good job of supervision, we must understand the precautions of each step. Generally speaking, there are two ways of

floor paving: suspension and keel. Generally strengthen the floor, solid wood floors are suspended. The first step: check the ground pad laying floor should also pay attention to the pad, the pad can not overlap, the joints with 60mm wide tape seal, surrounded by the side cited 30-50mm, can not exceed the skirting line. If the mat is thicker, the overlap of the mat is too high, which can cause the floor to arch.

The second step: floor shop floor is a natural growth, the existence of color problems, the need for color differentiation, communication reached paving consensus before paving. Therefore, before the official paving of the floor can be advanced test shop, pre test shop precautions include paving direction, paving the way and color preselection. The third step: the order of the floor pavement pavement, pay

cedar tongue and groove siding
synthetic plastic reed fencing for sale
outdoor play area fence wood


The Wall

No comments
You need to sign in to comment

Post

Added Jun 13 '17, 05:45PM

Rate

Your rate:
Total: (0 rates)