No matter what kind of factors cause water leakage, people often blame the roof garden, which for the promotion of the roof garden caused by social resistance. So planning and design and construction units and the use of units should have sufficient understanding. , Together to deal with the roof of the garden waterproof. Do not damage the original waterproof layer to implement vinyl flooring and roofing membrane the second waterproofing treatment, it is best to remove the roof of the overhead insulation layer, take the insulation layer, shall not pry the original waterproof layer.
Take after the cleaning, rinse to enhance the adhesion. Under normal circumstances, it is not permissible to drill holes and pipelines and embedded iron pieces and buried pillars on the built-in roof protection water layers. Therefore, in the roof of laminate wooden post bottom plastic covers the new building roof roof garden, the garden design department should provide the roof garden of the relevant technical information.
Such as the need to stay holes and want to shop and other information provided to the structural design units, and they will be reflected in the requirements of the building structure of the construction plans in order to achieve the construction of the roof garden of the technical requirements. If you add a roof garden to the old building, either the roof waterproofing of that practice is not perforated on the roof, buried laminate to laminate threshold plank in dubai iron and pillars. Even if the general equipment can not be "rooted" on the roof, can only take other measures to make them "floating" on the roof.
The Wall