Project of chest of hare darling whole the 3rd period put into production In December 2026, be located in male yuan the picture that the hare darling of the town lives in area of industrial garden garden to already presented flourishing. Through vacating basket change bird and build factory building, the terminal series product such as facing of door of investment build wood, chest, ambry, wood supplies base.
In first phase of project of chest of hare darling whole, 2 period on base of production of product line full load, 3 period product line already finished equipment to purchase, installation, formal already also put into production. Walk into chest workshop, it is numerical control operator is in at the same time attentive debug Germany to import line of bold and generous equipment, a stuff that has wardrobe, stop makings work; Across is operator is having finished product the sealing side of chest board.
At the back of the workshop, hit contractor to be in in an orderly way has all eligible panel installing wrap and delivering goods. Hare darling chest has 2 dimension yard on every panel, sweep a code to be able to understand this series situation that approves goods, include name of order order, product, agency full name, time issueing sheet, this also is informatization technology in the workshop manage gain. The adjustment through nearly two years and upgrade, company advocate the transition that Mu Yechu pace realizes course of study to serve industry to the brand by manufacturing industry, enter high speed to send exhibition period.
"waterproof a tile kithen floor,fancy plywood boards deck,prefab free standing decks for garden"
The Wall