construction period, acceptance and explain to users and obtain their approval. (1) the floor paving shall be carried out after the completion of the ground concealed works, the ceiling works, the wall projects, the hydropower projects and the completion of the project. (2) the strength and thickness of ground foundation shall be in accordance with the standards of housing acceptance. (3) the ground should be smooth, with 2m by foot detecting the flatness of the
ground by the maximum chord ruler and ground should be less than 5mm. (4) the degree of moisture on the ground should pay attention to, if the cement mortar leveling the ground, 5-7 days to be able to lay the floor. (5) it is strictly prohibited to use materials beyond mandatory standards. 2 floor, floor surface clean, smooth appearance specifications, no obvious floor and anchor line color, and must be shut floor installation compact, color coordination, joint is not
allowed. No obvious installation defects. To meet the requirements of the house decoration will be responsible for handling. 3, the floor surface layer specification (1) floor surface to smooth surface; (2) the assembly height difference in construction standard range; (3) a longitudinal slot; transverse slot (4) appropriate; (5) gap between the floor and wall and ground fixtures between to within the allowable range; (6) paint without damage and
The Wall