This process has the following aspects: (A) to investigate the original roof conditions to understand the structural characteristics of the roof system and the original waterproof layer of the installing bamboo fencing on ceiling characteristics of the material. observe the roof of the grassroots situation, if any cracking, roof dislocation and so on. to understand the extent of damage to the old waterproof layer, the use of detection equipment to determine the leakage point, according to the test results, quantitative assessment, and as the next step for the basis of leakage management.

for the details of the detailed investigation of can i recycle composite decking the structure, the skylight, chimneys, floods, yin and yang angle, water outlet, parapet and other parts of the careful inspection, record the leakage situation. a comprehensive analysis of the leakage situation On the basis of on-site investigation, the issues involved in a careful analysis to determine the scope of maintenance and specific governance measures.

This step includes: Leakage treatment According to the how to finish deck posts test results to determine whether the local repair or a comprehensive renovation, repair the size of the range, and what kind of construction methods.What is the requirement for the durability of the waterproof layer? Whether the performance index of the waterproofing material for management and maintenance can meet the requirements.If the grassroots cracks, dislocation, which should be taken to enhance the way.The construction wood plastic composite germany of the environment to consider, mainly the construction of materials transport, storage and so on. As a lot of waterproof materials and supporting adhesives, solvents and other flammable materials, pay special attention to fire measures.


The Wall

No comments
You need to sign in to comment

Post

Added Mar 22 '17, 08:05PM

Rate

Your rate:
Total: (0 rates)