be design. 2, the top support should be from the ground 50cm high first level support, after each additional 2m add a road. Horizontal bracing should be set vertically and horizontally. 3, supporting joints shall not be less than three plywood, plywood shall not be less than 50 * 8 * 2, 5cm, adjacent joints should be staggered with each other. 4, support the bottom of the ground shall be leveled and compacted, and padded wood, not bricks, adjust the high end of the wedge to nail the wedge pad should not be too high

(preferably 2). 5, the use of wood truss formwork should be strictly checked, found serious deformation, bolt loosening should be repaired in time. 6, take formwork process, there is no fixed template, shall carry out the procedure. Prohibit the use of rods, support climbing up and down. 7, a set of column template high above the 4m, shall be firmly supported around, the operation to the erection of working platform, 4m can use the high horse stool operation. 8, set up an independent beam model should be set up

temporary work platform, can not stand on the column mode operation and beam bottom die. 9, two people carrying the template to cooperate with each other, work together. Transfer the template, the tool uses the transportation tool or uses the rope to tie up, does not throw. 10, shall not be stacked on the scaffolding a large number of templates and other materials. 11, vertical and horizontal support, diagonal bracing, etc. shall not be taken on the door and window frame and scaffolding. The middle of the

best wood looking materials
installing hollow core composite decking
wood flooring around pool


The Wall

No comments
You need to sign in to comment

Post

Added Mar 12 '17, 04:27AM

Rate

Your rate:
Total: (0 rates)