First, large-scale maintenance machinery inspection and operation
1. Tamping, stabilizing, ballast shaping, rail grinding, cleaning and other large-scale road maintenance machinery,stable quality asphalt pavers for sale into the electrification section, you must check to confirm that the components (including the ride) does not exceed the locomotive vehicle limits.
2. In the ladder and can climb to the roof of the front and rear pedals,Efficient road slot machines Road Machinery should be coated with "contact with electricity, forbidden to climb" obvious warning signs, and maintain a clear, eye-catching.
3. When operating or staying on an electrified railway, the driver's room must be closed and locked when the driver's room is to be kept in operation.
4. In the electrified railway section,Road Construction product crack sealing machine forbidden to climb to the roof for maintenance, maintenance operations, prohibit the use of rubber hose water scouring vehicles.
5. In the electric railway station station stop, not boarded the rail car, large aircraft, camping vehicles and other vehicles at the top or through the top of the line.
6. Large-scale road maintenance machinery operation, should close the door, is strictly prohibited any person to grab, grab, not allowed to stuck out the body of the car, are not allowed in the car slapstick.
7. Climbing overhaul, it is necessary to strictly enforce the relevant provisions of high-altitude operations.
Second, large-scale road maintenance machinery operations
1. In the use of tamping cars, power stabilizers, rail grinding vehicles, such as its scope of work does not exceed the upper limit of the locomotive vehicles, and staff (including its range of action) and the live part of the distance maintained at 2-4m ,single drum compactor fuel economy and safety The catenary may not be an outage, but there must be on-site network monitoring workers.
2. Use of clean-screen vehicles, ballast-shaped vehicles and other vehicles beyond the limit line should be made in advance to the power dispatcher to apply for power outages, power dispatcher issued a power cut command, contact with the temporary installation of ground wire grounding, the construction leaders can be issued In the electrical safety, the construction leader must obey the guidance of the contact network, the end of construction, personnel evacuated, the contact network workers to remove the temporary ground wire, and notify the power dispatcher construction is completed. After removal of the temporary ground line, all personnel are strictly prohibited to re-enter the construction site.
3. The clearance roller, the ballast plastic vehicle should always pay attention to the signal machine, electrification line contact net column and other facilities, affecting the rotation of dirt conveyor belt operation, if necessary, adjust the rotation angle; after homework, all parts are prohibited before walking.
4. Operation in strict implementation of the "open the door, two Liao Wang, the three get off" system, such as found adjacent to the car, the driver must be continuous whistle alarm.
5. Winter on the car to pay attention to anti-skid operation, in case of snow and ice cold weather is strictly prohibited coat cover ears.
6. The operation of the group to the same action, motor vehicles and put down the tamping device, before the first beat flapping device, 5s and then action; vehicle monitoring personnel to concentrate, to prevent mechanical and tamping area flying ballast wounding.
7. Operation, when found to endanger the person, traffic, equipment safety, should immediately touch the red emergency stop button.