Solid wood flooring is properly installed inside knowledge of a lot of stress | Forum

Topic location: Forum home » General » General Chat
Deleted user Aug 30 '16, 07:15PM

Family people began to pay attention to the quality of life, a lot of friends home decoration when will choose to use wood flooring, wood flooring material relative to the general floor easier to clean and maintain. However, Corrosion diy deck solid wood flooring installation time is also very particular about, hereinafter friends to explain the wood floor installation knowledge, we can be concerned about. A solid wood floor installation steps.

1, first of all, to start cleaning up the construction site, the uneven ground corner, nook and other uneven places, trimmed the balance of the wall surface drilling, it is to install a little later baseboard, drilling is a technology live, you need to pay attention to medium height, even bored, depending on how long you have installed baseboard,The benefits of outdoor wall panel if there is 1.2 meters, it would probably drill 2-3 holes on it, this aspect of the baseboard when drilling is capable of binding local installation, finally, remember that the drilling device must be prevented in ambush inside wall of the circuit.

2, after doing the work ahead, we should clean the ground, respect means moisture-proof pad, because flexibility can effectively make up the surface of the imbalances moisture-proof pad, so as to achieve a flat surface, so that the wood after installation finished floor, stepped on it will feel different. After the moisture-proof mats Puwan, and also where the gap with tape paste, for fear of after prolonged use, moisture-proof pad will move, and the second is to enhance the anti-moisture properties. If the family needed to warm the device,Easy to install outdoor flooring then you need to change a little better mat to devices. 3, after the preceding basic work done, now start the installation of the wood flooring official.

Because the floor has caused the need to install and scattered, so the first part of the floor should sawn from the middle, the floor still saw some stress, and the first point, to choose some bad wood floors were divided into two, this can dispose of the bad, increase the utilization of solid wood flooring, solid wood flooring do not take good According to Oh, Durable Balcony Flooring this will be an enormous loss; second, saw wood flooring is the place, this is the luxurious, wood in floor sawing, when the sky will fall Feisa dust everywhere, so easy to choose a clean place, ensuring solid wood flooring after installation is easy to clean.